รศ.ดร. ธีรเดช วุฒิพรพันธ์

Assoc. Prof. Teeradej Wuttipornpun, Ph.D.

Email Address : teeradej.w@eng.kmutnb.ac.th

Ph.D. (Industrial Engineering), Sirindhorn International Institute of Technology (SIIT), Thammasat University, Thailand.

M.Eng. (Industrial Engineering), King Mongkut’s University of Technology North Bangkok, Thailand.

B.Eng. (Electrical Engineering), King Mongkut’s University of Technology Thonburi, Thailand.

Supply Chain

Logistics

ERP

Business Process Re-engineering

Software selection

Implementation strategy

Project management strategy

Change Management

Production and Inventory Management (P&IM)

Heuristic Scheduling Algorithms

Process improvement by using Lean, TQM, and JIT concept

Simulation Modeling and Analysis

International Journal

Sukkerd, W., and Wuttipornpun, T., (2016). Hybrid genetic algorithm and tabu search for finite capacity material requirement planning system in flexible flow shop with assembly operations. Computer and Industrial Engineering. 97, 157-169.

Wuttipornpun, T., and Yenradee, P., (2014). Finite capacity material requirement planning system for assembly flow shop with alternative work centres. International Journal of Industrial and Systems Engineering

Phdungsilp A., and Wuttipornpun, T., (2013). Analyses of the decarbonizing thailand’s energy system toward low-carbon futures. Renewable and Sustainable Energy Reviews. 24, 187-197.

Phdungsilp A., and Wuttipornpun, T., (2011). Energy and carbon modeling with multi-criteria decision-making towards sustainable industrial sector development in Thailand. Low Carbon Economy. 2, 165-172.

Phdungsilp, A., and Wuttipornpun, T., (2010). Modeling energy consumption and CO2 emissions in Thailand’s manufacturing sector. Asian International Journal of Science and Technology in Production and Manufacturing Engineering (AIJSTPME). 3(2), 29-35.

Wuttipornpun, T., and Yenradee, P., (2007). Performace of TOC based finite capacity material requirement planning system for a multi-stage assembly factory. Production Planning and Control. 18(8), 703-715.

Wuttipornpun, T., and Yenradee, P., (2007). A new approach for finite capacity material requirement planning system. Thammasat Internaional Journal of Science and Technology. 15(2), 28-51.

Wuttipornpun, T., Yenradee, P., Beullens, P., and Oudheusden, D. L., (2006). Finite capacity material requirement planning system for a multi-stage automotive-part assembly factory. Science Asia. 32, 303-313.

Wuttipornpun, T., and Yenradee, P., (2004). Development of finite capacity material requirement planning system for assembly operations. Production Planning and Control. 15(5), 534-549.

International Conference

Songserm, W., and Wuttipornpun, T., (2017). A Genetic Algorithm Based Permutation and Non-Permutation Scheduling Heuristics for Finite Capacity Material Requirement Planning Problem. 19th International Conference on Industrial Management, Engineering and Logistics, ICMIEL 2017. Phuket, Thailand, Mar 06-07, 2017, 19(3), 455-460.

Phdungsilp, A., and Wuttipornpun, T., (2011). Decision support for the selection of electric power plants generated from renewable sources. International Conference on Energy, Environment, Sustainable Development, ICEESD 2011 . Bangkok, Thailand, Mar 29-31, 202-207.

Wuttipornpun, T., and Yenradee, P., (2003). Performance analysis of finite capacity material requirement planning system for a capacity-constrained flow shop. In Proceedings of the 12th International Pacific Conference on Automotive Engineering, IPCAE 2003. Bangkok, Thailand, 1-4 April 2003. .

National Journal

Jaturanonda, C., Phiphathananan, P.,and Wuttipornpun, T., (2018). White Stain Reduction in Electroplating Process of Flexible Printed Circuit Board by Using Design of Experiment. The Journal of KMUTNB

Raksasit, P., Pimapunsri, K., and Wuttipornpun, T., (2015). Wastes reduction in allyl chloride distillation process using response surface experiment. The Journal of KMUTNB. 25(3), 393-403.

Koonmee, P., Songserm, W., and Wuttipornpun, T., (2014). The use of granular blast furnace slag in concrete manufacturing: Statistical analysis. The Journal of KMUTNB. 24(1), 103-110.

Theptawee, K., and Wuttipornpun, T., (2013). Cooling capacity improvement of reciprocating compressor with a DOE approach. The Journal of KMUTNB. 23(1), 138-147.

Sangudon, S., and Wuttipornpun, T., (2012). Application of hybrid genetic algorithms for assembly flow shop scheduling problem. The Journal of KMUTNB. 22(1), 107-117.

Praphutthakhun, K., and Wuttipornpun, T., (2011). A study of optimal proportion of factors in concrete ready mixed process using factorial experiment. The Journal of KMUTNB. 21(2), 313-320.

Wuttipornpun, T., (2010). Analysis of welding factors to determine an optimal condition of resistant spot welding process. The Journal of KMUTNB. 20(1), 1-9.

National Conference

Pipattananan, P., and Wuttipornpun, T., (2016). Defects Reduction in Flexible Printed Circuit Board Electroplating Process. 7th National Conference of Industrial Operations Development 2016. Nonthaburi, Thailand., May 12, 2016.

Masamran, W., and Wuttipornpun, T., (2009). A study of effects of AGV control factors in flexible manufacturing system.  Proceedings of Industrial Engineering Network Conference 2009. Khonkean, Thailand, 21-22 October 2009,  1318-1326.

Praphutthakhun, K., and Wuttipornpun, T., (2009). Determination of optimal factors in concrete mixing process using design of experiment. Proceedings of Industrial Engineering Network Conference 2009. Khonkean, Thailand, 21-22 October 2009, 620-627.

Henprasert, W., and Wuttipornpun, T., (2009). Production scheduling for MRP system under capacity and overtime constraints. Proceedings of Industrial Engineering Network Conference 2009. Khonkean, Thailand, 21-22 October 2009, 37-45.

Sae-Jew, J., Monthatipkul, C., and Wuttipornpun, T., (2007). A dynamic set partitioning-based model for the vehicle routing problem. Proceedings of the 7th Industrial Academic Annual Conference on Supply Chain and Logistics Management. Bangkok, Thailand,15-16 November 2007.

Monthatipkul, C., and Wuttipornpun, T., (2007).  A mixed integer programming model to control a One-warehouse/N-Store supply chain. Proceedings of the 7th Industrial Academic Annual Conference on Supply Chain and Logistics Management. Bangkok, Thailand,15-16 November 2007.

Bachelor of Engineering (Industrial Engineering)

010913557 วิธีการจัดลำดับและจัดตารางการผลิต (Production Sequencing and Scheduling Methods) 

Master of Engineering (Industrial Engineering)

010935434 การบริหารการดำเนินงาน (Operations Management) 

Master of Engineering (Industrial Management Engineering)

010935434 การบริหารการดำเนินงาน (Operations Management) 

Doctor of Philosophy (Industrial Engineering)